Working with EPCs — End-to-End Renewable Energy Engineering Learn More
Grand View PV Solar 2 featured in Solar Industry Magazine
Partners Cut Ribbon On 108 MW Idaho Solar Project.
Clenera LLC and Swinerton Renewable Energy have cut the ribbon on the Grand View PV Solar Two facility, located in Elmore County, Idaho.
Construction on the 108 MW solar project, consisting of 81 MW and 27 MW systems built on a total of 673 acres, was completed in September. Grand View will be among the first utility-scale projects to be brought online in the state’s history when it begins commercial operation in late November.
Swinerton Renewable Energy provided engineering, procurement, and construction services at Grand View and worked closely with colleagues at Blymyer Engineers to develop the design.
Blymyer Engineers were structural and electrical engineers of record for this project and provided the design and construction documents as well as energy modeling and analysis.
(Excerpt from Solar Industry Magazine)
———-
Read full Solar Industry Magazine article:
https://solarindustrymag.com/partners-cut-ribbon-on-108-mw-idaho-solar-project
Read full Market Wired article:
https://www.marketwired.com/press-release/clenera-and-swinerton-renewable-energy-bring-solar-energy-to-idaho-communities-2174716.htm
Read full Swinerton Renewable Energy blog:
https://www.swinerton.com/blog/swinerton-renewable-energy/swinerton-renewable-energy-builds-solar-installation-for-idaho-youth-camp