WattEV | Bakersfield, California

WattEV, a leading California-based charging infrastructure developer for heavy-duty electric powered trucks, recently unveiled three new electric truck-charging depots, funded by $75.8 million in federal grant money. Blymyer Engineers partnered with WattEV on the three projects. Two of the charging depots, one of which is in Bakersfield, are located along the I-5 corridor in California’s Central Valley. The third depot is in Blythe on the California-Arizona border. Engineer: Blymyer Engineers | Partner: WattEV | Developer: WattEV | Utility: San Joaquin Valley Air Pollution Control District

Tesla City Center | San Francisco, California

Top level of garage. Blymyer provided electrical engineering, structural engineering, utility coordination, structural upgrades to the existing garage to support EV equipment.

Do Not Sell or Share My Personal Information