WattEV | Bakersfield, California

WattEV, a leading California-based charging infrastructure developer for heavy-duty electric powered trucks, recently unveiled three new electric truck-charging depots, funded by $75.8 million in federal grant money. Blymyer Engineers partnered with WattEV on the three projects. Two of the charging depots, one of which is in Bakersfield, are located along the I-5 corridor in California’s Central Valley. The third depot is in Blythe on the California-Arizona border. Engineer: Blymyer Engineers | Partner: WattEV | Developer: WattEV | Utility: San Joaquin Valley Air Pollution Control District

MARS Energy | Santa Rosa, California

Blymyer provided electrical engineering, structural engineering, EV charging system design, and permitting support. 7 Stalls EV Chargers – ChargePoint Express 250 (62.5 KW DC)

SiteLogiq | Camarillo, California (3 sites)

Blymyer provided electrical engineering, BESS installation design, EV charging system design, and project management.

BP Pulse | California

Blymyer provided electrical engineering, BESS installation design, and EV charging system design. 6 EV Chargers.

WattEV | Sacramento, California

Blymyer provided electrical engineering, BESS installation design, EV charging system design, SCADA design, substation design, project management, and permitting assistance. High power EV chargers at 1.2MW each.

A white Tesla car charges at a solar-powered Tesla Supercharger station next to a McDonald's restaurant on a sunny day.

Tesla Firebaugh | Firebaugh, California

Blymyer provided electrical engineering for the EV charging system design. 56 EV Chargers (Superchargers with up to 250kW charging speed)

Tesla City Center | San Francisco, California

Top level of garage. Blymyer provided electrical engineering, structural engineering, utility coordination, structural upgrades to the existing garage to support EV equipment.

Do Not Sell or Share My Personal Information