Energy Storage (BESS)

Harquahala | Tonopah, Arizona

Utility-scale solar AC photovoltaic and energy storage project. Blymyer provided electrical engineering, structural engineering, electrical design, SCADA design/drafting assistance, permitting assistance, and BESS fire protection design.

San Juan | Kirtland, New Mexico

Utility-scale solar AC photovoltaic system and energy storage system project. Blymyer provided electrical engineering, structural engineering, BESS design, fire protection design for BESS system, electrical design, SCADA design, and permitting assistance.

Franklin Solar | Rogerson, Idaho

Utility-scale solar AC photovoltaic and energy storage project. Blymyer provided electrical engineering, structural engineering, electrical design, BESS design, SCADA design/drafting assistance, permitting assistance, and BESS fire protection design.

Rows of utility scale solar panels installed outdoors in a dry, sunny California landscape, with mountains visible in the background under a clear blue sky.

Oberon 1 & 2 | California

Utility-scale solar AC photovoltaic and energy storage project. Single-axis tracking photovoltaic arrays. Blymyer provided electrical engineering, structural engineering, and project management assistance for both PV and energy storage.

WattEV | Bakersfield, California

WattEV, a leading California-based charging infrastructure developer for heavy-duty electric powered trucks, recently unveiled three new electric truck-charging depots, funded by $75.8 million in federal grant money. Blymyer Engineers partnered with WattEV on the three projects. Two of the charging depots, one of which is in Bakersfield, are located along the I-5 corridor in California’s Central Valley. The third depot is in Blythe on the California-Arizona border. Engineer: Blymyer Engineers | Partner: WattEV | Developer: WattEV | Utility: San Joaquin Valley Air Pollution Control District

Project Nexus | Stanislaus County, California

Project Nexus includes the installation of solar panel canopies over various sections of Turlock Irrigation District’s (TID) irrigation canals. Solar-over-canal design, deployment, and co-benefits on behalf of the State of California using TID infrastructure and electrical grid access. First in the Nation project. TID was the first publicly owned irrigation district in California. Collaboration among public, private, and academic sectors. Funded by the State of California. Two project sites along various sections of TID’s canal system. Providing over 1.6MW of renewable power generation. Energy storage incorporated at the Narrow-span location through 75kW iron-flow batteries. Partners: Turlock Irrigation District, California Department of Water Resources, Solar AquaGrid, and UC Merced.

Victory Pass and Arica | Desert Center, California

Blymyer provided structural design work, electrical engineering, and project management. Arica: 263MW Solar, 136MWh Energy Storage. Victory Pass: 200MW Solar, 50MWh Energy Storage. 34.5/230kV, 514MVA Substation.

Chestnut | Kings County, California

Utility-scale solar photovoltaic, energy storage, and substation project. Single-axis tracker PV arrays, 4-hour battery energy storage system utilizing Tesla Megapack 2XL technology, and high-voltage substation. Blymyer provided comprehensive electrical engineering and structural engineering services for the PV system, energy storage, and substation, along with infrastructure fire protection design and project management assistance.

A row of white Tesla battery storage units installed outdoors on gravel beside a modern building with grass in the foreground.

Tesla | California and New York

Blymyer provided the structural engineering, electrical engineering, site layout, permitting, and construction support. Projects include:
Newport Gateway, 2 systems | Irvine, California | 1.0MW/6.72MWh
Morgan Stanley | San Francisco, California | 500kW/1.26MWh
Costa Mesa, California | 1MW/6.51MWh
Lathrop, California | 2MW/4MWh
Illumina | San Diego, California | 1MW/2MWh
Port Hueneme, California | 1MW/2MWh
GAP | Fresno, California | 1MW/2MWh
CSU | Long Beach, California | 1MW/2MWh
Brea, 2 sites | California | 250kW/500kWh
Van Brunt | Brooklyn, New York | 100kW/190kWh
G.P. Johnson | Torrance, California | 250kW/500kWh

Silverstrand | Camarillo, California

Blymyer provided structural and electrical engineering services on the project. Able Grid developed and operates this energy storage facility which includes 15 Tesla Megapacks.

Agua Fria | Glendale, Arizona

Blymyer Engineers provided the structural and electrical engineering services for this energy storage addition which includes 35 Tesla Megapack batteries. Agua Fria adds energy storage capacity to support a generating station during periods of peak demand.

Several large electrical units are installed on a concrete pad at in Carpinteria, California, with mountains and a clear blue sky in the background.

Vallecito | Carpinteria, California

Blymyer provided the structural and electrical engineering services on this storage facility that adds greater grid resiliency to an area where electric supply is unreliable. This project includes 15 Tesla Megapacks. Viridity Energy operates the facility.