Blymyer provided electrical engineering, structural engineering, and the complete designs for substation and BESS. Blymyer also provided utility interconnection coordination and permitting assistance, as well as construction phase support. Arica: 263 MW Solar, 544 MWh Energy Storage. Victory Pass: 200 MW Solar, 200 MWh Energy Storage. 34.5/230 kV, 514 MVA Substation.