Victory Pass and Arica | Desert Center, California
463 MW Solar
744 MWh Energy Storage
34.5/230 kV
Blymyer provided electrical engineering, structural engineering, and the complete designs for substation and BESS. Blymyer also provided utility interconnection coordination and permitting assistance, as well as construction phase support. Arica: 263 MW Solar, 544 MWh Energy Storage. Victory Pass: 200 MW Solar, 200 MWh Energy Storage. 34.5/230 kV, 514 MVA Substation.