Ash Creek | Abbott, Texas

Utility-scale solar AC photovoltaic system and substation project. Blymyer provided electrical engineering, structural engineering, substation design, SCADA design/drafting assistance, and permitting assistance.

Muscle Shoals | Colbert County, Alabama

Utility-scale solar AC photovoltaic system and substation project. Single-axis tracking photovoltaic arrays. Blymyer provided electrical engineering, utility engineering, and structural engineering as well as complete and detailed design of 161kV substation.

Kiowa County Solar Project | Kiowa County, Oklahoma

Utility-scale solar AC photovoltaic system and substation project. Blymyer provided electrical engineering, structural engineering, substation design, SCADA design, electrical design, and permitting assistance. Owned by Savion. Photo credit: Brian Doll, SOLV Energy.

Big Plain | Madison County, Ohio

Blymyer provided electrical engineering, structural engineering, and architectural design. Blymyer also provided project management assistance and substation design.

Alabama Solar A Project | Chambers County, Alabama

Single-axis tracking, step-up collector substation and neutral grounding reactor. Blymyer provided electrical engineering, utility engineering, structural engineering, and complete detailed design.

Victory Pass and Arica | Desert Center, California

Blymyer provided structural design work, electrical engineering, and project management. Arica: 263MW Solar, 136MWh Energy Storage. Victory Pass: 200MW Solar, 50MWh Energy Storage. 34.5/230kV, 514MVA Substation.

Chestnut | Kings County, California

Utility-scale solar photovoltaic, energy storage, and substation project. Single-axis tracker PV arrays, 4-hour battery energy storage system utilizing Tesla Megapack 2XL technology, and high-voltage substation. Blymyer provided comprehensive electrical engineering and structural engineering services for the PV system, energy storage, and substation, along with infrastructure fire protection design and project management assistance.

Central 40 | Stanislaus County, California

Step-up collector substation. Blymyer provided electrical and structural engineering. Blymyer also provided design and engineering documents and engineering support during the construction phase.