Working with EPCs — End-to-End Renewable Energy Engineering Learn More

Taygete 1 & 2 | Pecos County, Texas
500MW/1.5GWh Solar
Blymyer provided energy modeling and complete engineering along with complete design and structural and electrical engineering for this ground-mounted, single-axis tracking utility-scale system, and substation design. Adds enough solar electricity to the U.S. grid to power 180,000 homes per year.