
Taygete 1 & 2 | Pecos County, Texas
500 MW Solar
34.5/2138 kV, 277.2 MVA Substation
1.5 GWh Energy Storage
Blymyer provided energy modeling and complete engineering along with complete design and structural and electrical engineering for this ground-mounted, single-axis tracking utility-scale system, and substation design.