Energy Storage (BESS)

Mira Loma/Tesla

Ontario, CA

Battery plant, electrical and structural engineering.

Agua Fria

Glendale, Arizona

Blymyer Engineers provided the structural and electrical engineering services for this energy storage addition which includes 35 Tesla Megapack batteries. Agua Fria adds energy storage to a generating station that operates during periods of peak demand.

Tesla

Tesla | Blymyer provided the structural and electrical engineering, site layout, permitting and construction support.

Projects include:
Newport Gateway, 2 systems, Irvine, California, 1.0MW/6.72MWh
Morgan Stanley, San Francisco, California, 500kW/1.26MWh
Costa Mesa, 1MW/6.51MWh
Lathrop, California, 2MW/4MWh
Illumina, San Diego, California, 1MW/2MWh
Port Hueneme, California, 1MW/2MWh
GAP, Fresno, California, 1MW/2MWh
CSU, Long Beach, California, 1MW/2MWh
Brea, 2 sites/, California, 250kW/500kWh
Van Brunt, Brooklyn, New York, 100kW/190kWh
G.P. Johnson, Torrance, California, 250kW/500kWh

Vallecito

Carpinteria, California

Blymyer Engineers provided the structural and electrical engineering services on this storage facility that adds greater grid resiliency to an area where electric supply is unreliable. This project includes 15 Tesla Megapacks. Viridity Energy operates the facility.

Silverstrand

Camarillo, California

Blymyer Engineers delivered the structural and electrical engineering services on the project. Able Grid developed and operates this energy storage facility which includes 15 Tesla Megapacks.