San Juan | Kirtland, New Mexico

Utility-Scale Solar AC Photovoltaic System and Energy Storage System project.
Blymyer provided electrical engineering, structural engineering, BESS design, fire protection design for BESS system, electrical design, SCADA design, and permitting assistance. 200MW (Solar) | 400MWh (Energy Storage System)

Do Not Sell or Share My Personal Information