Energy Storage Projects

Energy Storage

View full project list

project image

Agua Fria

Glendale, Arizona
 25MW/100MWh
Blymyer Engineers provided the structural and electrical engineering services for this energy storage addition which includes 35 Tesla Megapack batteries. Agua Fria adds energy storage to a generating station that operates during periods of peak demand.

project image

Vallecito

Carpinteria, California
 10MW/40MWh
Blymyer Engineers provided the structural and electrical engineering services on this storage facility that adds greater grid resiliency to an area where electric supply is unreliable. This project includes 15 Tesla Megapacks. Viridity Energy operates the facility.

project image

Silverstrand

Camarillo, California
 11MW / 44MWh
Blymyer Engineers delivered the structural and electrical engineering services on the project. Able Grid developed and operates this energy storage facility which includes 15 Tesla Megapacks.

project image

Mira Loma/Tesla

Ontario, CA
20 MW/80 MWh
Battery plant, electrical and structural engineering.

project image

Newport Gateway/Tesla, 2 systems

Irvine, CA, 2018
1.0 MW/6.72 MWh
Battery plant, electrical and structural engineering.

project image

Morgan Stanley/Tesla

San Francsico, CA, 2018
500kW/1.26 MWh
Battery plant, electrical and structural engineering.

project image

Costa Mesa/Tesla

Costa Mesa, CA, 2018
1 MW/6.51 MWh
Battery plant, electrical and structural engineering.

project image

DTE

Woodland, CA, 2016
25 MW/100 MWh
Battery plant. Preliminary design.

project image

Illumina/Tesla

San Diego, CA, 2015
1 MW/2 MWh
Battery plant. Design build.
Blymyer Engineers provided the structural and electrical engineering, site layout, permitting and construction support. The installation was completed by BEI Construction.

project image

Port Hueneme/Tesla

Port Hueneme, CA, 2015
1 MW/2 MWh
Battery plant. Design build.
Blymyer Engineers provided the structural and electrical engineering, site layout, permitting and construction support. The installation was completed by BEI Construction.

project image

GAP/Tesla

Fresno, CA, 2015
1 MW/2 MWh
Battery plant. Design build.
Blymyer Engineers provided the structural and electrical engineering, site layout, permitting and construction support. The installation was completed by BEI Construction.

project image

CSU/Tesla

Long Beach, CA, 2015
1 MW/2 MWh
Battery plant. Design build.
Blymyer Engineers provided the structural and electrical engineering, site layout, permitting and construction support.

project image

Brea 2 sites/Tesla

Brea, CA, 2015
250 kW/500 kWh
Battery plant. Design build.
Blymyer Engineers provided the structural and electrical engineering, site layout, permitting and construction support. The installation was completed by BEI Construction.

project image

Van Brunt/Tesla

Brooklyn, NY, 2015
100kW/190kWh
Battery plant, electrical and structural engineering.

project image

G.P. Johnson/Tesla

Torrance, CA, 2015
250 kW/500 kWh
Battery plant. Design build.

project image

Lathrop/Tesla

Lathrop, CA, 2015
2 MW/4 MWh
Battery plant. Engineered and project management.