Energy Storage (BESS)

Agua Fria

Glendale, Arizona

Blymyer Engineers provided the structural and electrical engineering services for this energy storage addition which includes 35 Tesla Megapack batteries. Agua Fria adds energy storage to a generating station that operates during periods of peak demand.

Vallecito

Carpinteria, California

Blymyer Engineers provided the structural and electrical engineering services on this storage facility that adds greater grid resiliency to an area where electric supply is unreliable. This project includes 15 Tesla Megapacks. Viridity Energy operates the facility.

Silverstrand

Camarillo, California

Blymyer Engineers delivered the structural and electrical engineering services on the project. Able Grid developed and operates this energy storage facility which includes 15 Tesla Megapacks.

Mira Loma/Tesla

Ontario, CA

Battery plant, electrical and structural engineering.

Morgan Stanley Logo

Morgan Stanley/Tesla

San Francsico, CA, 2018

Battery plant, electrical and structural engineering.

City of Costa Mesa California Seal

Costa Mesa/Tesla

Costa Mesa, CA, 2018

Battery plant, electrical and structural engineering.

DTE

Woodland, CA, 2016

Battery plant. Preliminary design.

illumina logo with TESLA logo

Illumina/Tesla

San Diego, CA, 2015

Battery plant. Design build.
Blymyer Engineers provided the structural and electrical engineering, site layout, permitting and construction support. The installation was completed by BEI Construction.

City of Port Hueneme Ventura Counta, CA Seal with TESLA Logo

Port Hueneme/Tesla

Port Hueneme, CA, 2015

Battery plant. Design build.
Blymyer Engineers provided the structural and electrical engineering, site layout, permitting and construction support. The installation was completed by BEI Construction.

GAP Logo and TESLA Logo

GAP/Tesla

Fresno, CA, 2015

Battery plant. Design build.
Blymyer Engineers provided the structural and electrical engineering, site layout, permitting and construction support. The installation was completed by BEI Construction.

CSU/Tesla

Long Beach, CA, 2015

Battery plant. Design build.
Blymyer Engineers provided the structural and electrical engineering, site layout, permitting and construction support.

Photo of power meters

Brea 2 sites/Tesla

Brea, CA, 2015

Battery plant. Design build.
Blymyer Engineers provided the structural and electrical engineering, site layout, permitting and construction support. The installation was completed by BEI Construction.

Van Brunt Stillhouse

Van Brunt/Tesla

Brooklyn, NY, 2015

Battery plant, electrical and structural engineering.

City of Lathrop California Seal with TESLA Logo

Lathrop/Tesla

Lathrop, CA, 2015

Battery plant. Engineered and project management.