Energy Storage Projects

Agua Fria

Glendale, Arizona

25MW/100MWh

Blymyer Engineers provided the structural and electrical engineering services for this energy storage addition which includes 35 Tesla Megapack batteries. Agua Fria adds energy storage to a generating station that operates during periods of peak demand.

Vallecito

Carpinteria, California

10MW/40MWh

Blymyer Engineers provided the structural and electrical engineering services on this storage facility that adds greater grid resiliency to an area where electric supply is unreliable. This project includes 15 Tesla Megapacks. Viridity Energy operates the facility.

Silverstrand

Camarillo, California

11MW/44MWh

Blymyer Engineers delivered the structural and electrical engineering services on the project. Able Grid developed and operates this energy storage facility which includes 15 Tesla Megapacks.

Mira Loma/Tesla

Ontario, CA

20MW/80MWh

Battery plant, electrical and structural engineering.

Newport Gateway Logo

Newport Gateway/Tesla, 2 systems

Irvine, CA, 2018

1.0MW/6.72MWh

Battery plant, electrical and structural engineering.

Morgan Stanley Logo

Morgan Stanley/Tesla

San Francsico, CA, 2018

500kW/1.26MWh

Battery plant, electrical and structural engineering.

City of Costa Mesa California Seal

Costa Mesa/Tesla

Costa Mesa, CA, 2018

1MW/6.51MWh

Battery plant, electrical and structural engineering.

DTE

Woodland, CA, 2016

25MW/100MWh

Battery plant. Preliminary design.

illumina logo with TESLA logo

Illumina/Tesla

San Diego, CA, 2015

1MW/2MWh

Battery plant. Design build.
Blymyer Engineers provided the structural and electrical engineering, site layout, permitting and construction support. The installation was completed by BEI Construction.

City of Port Hueneme Ventura Counta, CA Seal with TESLA Logo

Port Hueneme/Tesla

Port Hueneme, CA, 2015

1MW/2MWh

Battery plant. Design build.
Blymyer Engineers provided the structural and electrical engineering, site layout, permitting and construction support. The installation was completed by BEI Construction.

GAP Logo and TESLA Logo

GAP/Tesla

Fresno, CA, 2015

1MW/2MWh

Battery plant. Design build.
Blymyer Engineers provided the structural and electrical engineering, site layout, permitting and construction support. The installation was completed by BEI Construction.

CSU/Tesla

Long Beach, CA, 2015

1MW/2MWh

Battery plant. Design build.
Blymyer Engineers provided the structural and electrical engineering, site layout, permitting and construction support.

Photo of power meters

Brea 2 sites/Tesla

Brea, CA, 2015

250kW/500kWh

Battery plant. Design build.
Blymyer Engineers provided the structural and electrical engineering, site layout, permitting and construction support. The installation was completed by BEI Construction.

Van Brunt Stillhouse

Van Brunt/Tesla

Brooklyn, NY, 2015

100kW/190kWh

Battery plant, electrical and structural engineering.

George P Johnson Experience Marketing Logo with TESLA Logo

G.P. Johnson/Tesla

Torrance, CA, 2015

250kW/500kWh

Battery plant. Design build.

City of Lathrop California Seal with TESLA Logo

Lathrop/Tesla

Lathrop, CA, 2015

2MW/4MWh

Battery plant. Engineered and project management.