Energy Storage Projects
Energy Storage

Agua Fria
Glendale, Arizona
25MW/100MWh
Blymyer Engineers provided the structural and electrical engineering services for this energy storage addition which includes 35 Tesla Megapack batteries. Agua Fria adds energy storage to a generating station that operates during periods of peak demand.

Vallecito
Carpinteria, California
10MW/40MWh
Blymyer Engineers provided the structural and electrical engineering services on this storage facility that adds greater grid resiliency to an area where electric supply is unreliable. This project includes 15 Tesla Megapacks. Viridity Energy operates the facility.

Silverstrand
Camarillo, California
11MW / 44MWh
Blymyer Engineers delivered the structural and electrical engineering services on the project. Able Grid developed and operates this energy storage facility which includes 15 Tesla Megapacks.

Mira Loma/Tesla
Ontario, CA
20 MW/80 MWh
Battery plant, electrical and structural engineering.

Newport Gateway/Tesla, 2 systems
Irvine, CA, 2018
1.0 MW/6.72 MWh
Battery plant, electrical and structural engineering.

Morgan Stanley/Tesla
San Francsico, CA, 2018
500kW/1.26 MWh
Battery plant, electrical and structural engineering.

Costa Mesa/Tesla
Costa Mesa, CA, 2018
1 MW/6.51 MWh
Battery plant, electrical and structural engineering.

DTE
Woodland, CA, 2016
25 MW/100 MWh
Battery plant. Preliminary design.

Illumina/Tesla
San Diego, CA, 2015
1 MW/2 MWh
Battery plant. Design build.
Blymyer Engineers provided the structural and electrical engineering, site layout, permitting and construction support. The installation was completed by BEI Construction.

Port Hueneme/Tesla
Port Hueneme, CA, 2015
1 MW/2 MWh
Battery plant. Design build.
Blymyer Engineers provided the structural and electrical engineering, site layout, permitting and construction support. The installation was completed by BEI Construction.

GAP/Tesla
Fresno, CA, 2015
1 MW/2 MWh
Battery plant. Design build.
Blymyer Engineers provided the structural and electrical engineering, site layout, permitting and construction support. The installation was completed by BEI Construction.

CSU/Tesla
Long Beach, CA, 2015
1 MW/2 MWh
Battery plant. Design build.
Blymyer Engineers provided the structural and electrical engineering, site layout, permitting and construction support.

Brea 2 sites/Tesla
Brea, CA, 2015
250 kW/500 kWh
Battery plant. Design build.
Blymyer Engineers provided the structural and electrical engineering, site layout, permitting and construction support. The installation was completed by BEI Construction.

Van Brunt/Tesla
Brooklyn, NY, 2015
100kW/190kWh
Battery plant, electrical and structural engineering.

G.P. Johnson/Tesla
Torrance, CA, 2015
250 kW/500 kWh
Battery plant. Design build.

Lathrop/Tesla
Lathrop, CA, 2015
2 MW/4 MWh
Battery plant. Engineered and project management.